Stationary Widing Engines

The MSTS 1 Route Editor can be a beast to use, but it's capable of some amazing results, here you can talk with the wizards that are building some of the fantastic routes available and learn how to make your own.

Moderator: Moderators

User avatar
darren10000
Established Forum Member
Posts: 496
Joined: Thu Feb 02, 2006 11:33 am
Location: Virtual Longhedge Engine Works or on the floor of my Local in Herne Bay Hic...

Stationary Widing Engines

Post by darren10000 »

Is it possible to build a route using Stationary Engines. I know you can get away with Inclined Planes as there is a US route which uses them.

The Reason is I am considering building the Canterbury - Whitstable Rly as it was in the 1830's. It's only a single track 5 3/4 mile line but so far it is causing me Migranes!!! :evil:
User avatar
thenudehamster
Very Active Forum Member
Posts: 5029
Joined: Wed Sep 10, 2003 7:56 pm
Location: Somewhere in cyberspace
Contact:

Post by thenudehamster »

Basically, I think what you might have to do is fudge the idea with an invisible engine on the front (or rear) of the train. MST does like a moving engine somewhere, I'm afraid...

Unless, of course, someone has a better idea....
BarryH - thenudehamster
(nothing to do with unclothed pet rodents -- it's just where I used to live)
-----------------
Any opinion expressed above is herein warranted to be worth exactly what you paid for it.
User avatar
salopiangrowler
Very Active Forum Member
Posts: 7796
Joined: Mon Aug 12, 2002 8:56 pm
Location: Shrewsbury
Contact:

Post by salopiangrowler »

dont the Mine engines on the foxfield rotate
Image
User avatar
andrewgadd
Well Established Forum Member
Posts: 910
Joined: Sat Aug 02, 2003 1:22 pm
Location: CME Office, Bodgit & Scarper Engineering.
Contact:

Post by andrewgadd »

I'm not sure that I understand the question correctly, but

Any piece of scenery can be animated in a loop and this scenery can have any number of frames up to about 10,000. These frames can be played as fast or as slowly as needed.
For example; I an currently building a canal side scene all as one shape, with canal, locks, wharf, buildings, towpath and narrow boats included. Having gone that far, I then animated the shape so that now there are four boats, three locks with working gates, rising/falling water and boats locking up, down and passing each other in the pounds!

I hope that this helps.
Andrew.
AdamsRadial
Been on the forums for a while
Posts: 257
Joined: Mon Jun 21, 2004 1:00 pm
Location: In LSWR country
Contact:

Post by AdamsRadial »

I think the Funicular railway on the Australian Steam4me site might be closest to what you are trying to do.

http://steam4me.railpage.org.au/trainsi ... cline.html
dkightley
Very Active Forum Member
Posts: 9802
Joined: Sat May 08, 2004 8:52 pm

Post by dkightley »

...which is the funicular on the London & Port Stanley route...which is superb!

And I think Adam's right. The nearest you'll be able to get is to have a track like on the L&PS funicular with a train made up of wagons and "rope" wagons. If there's a drum in view, the best you;ll be able to do is to animate it as a scenery object..but it'll still rotate when you stop the "train"
User avatar
andrewgadd
Well Established Forum Member
Posts: 910
Joined: Sat Aug 02, 2003 1:22 pm
Location: CME Office, Bodgit & Scarper Engineering.
Contact:

Post by andrewgadd »

Sorry for being a bit dense here but, are we on about a funicular railway as an extra (scenery) to the route.
If we are then what I wrote earlier still holds true. You make the funicular railway as one shape complete with coaches then animate them moving up and down the line (with a little bit of buggering about, the ropes could work to) the export the whole piece of scenery to your route.
Whole animated scenes are possible in MSTS provided that you do not need them to interact with the trains. This is not entirely true as road crossing can be introduced into the scenario.

Andrew.
dkightley
Very Active Forum Member
Posts: 9802
Joined: Sat May 08, 2004 8:52 pm

Post by dkightley »

Andrew

No...the funicular is actually a driveable route! You can go up and down at your heart's content!

I seriously recommend the L&PS route. It has a fantastic level of detail...and the funicular thrown in as a novelty.

Can't remember where its available from...but do a search on the foum to find it...


Doug
User avatar
andrewgadd
Well Established Forum Member
Posts: 910
Joined: Sat Aug 02, 2003 1:22 pm
Location: CME Office, Bodgit & Scarper Engineering.
Contact:

Post by andrewgadd »

Okay, thanks Doug, now I understand.

Although all this speculation has given me another idea!!!

Andrew,
AdamsRadial
Been on the forums for a while
Posts: 257
Joined: Mon Jun 21, 2004 1:00 pm
Location: In LSWR country
Contact:

Post by AdamsRadial »

I hope that Darren10000 does go ahead and model the C&W, it would be wonderful to see some of the very early lines. MSTS has a lot of potential for historical visualisations, and as yet very little use has been made of this potential. It would be a real challenge for someone to try and model the atmospheric railways as well as the winding house lines.

The Australian funicular should be an example to us of just how far a determined modeller can push the 'limits' of MSTS, and each time I see a new route come out, I realise that we still haven't got the best out of the program yet.
User avatar
curate
Established Forum Member
Posts: 474
Joined: Wed Jul 19, 2006 11:50 pm
Location: Shropshire, UK

Post by curate »

I've been trying to do this as a scenery item, but having looked at the tutorial, my on-going problem is that I want the tracks to slope at more than the allowable MSTS gradient (some N Wales slate quarries had inclines at rather more than 45degrees) and I know that there's a way to do this, but I've never quite found out how - the pointers I've found are always to archived pages that never show up when I click on the link(s).

David
[Edit: If this post appears a little mangled, it's because it originally pointed to Steam4Me/../incline as help for use on a drivable route, so:
I promise I will find all the posts in each thread I reply to...
I promise I will find all the posts in each thread I reply to...
I promise I will find all the posts in each thread I reply to... [x100]
Sorry, missed the pointer to the Steam4Me tutorial that had already been posted. And I hate asking for help without offering help to others, so just ignore me and I'll go away.]
User avatar
andrewgadd
Well Established Forum Member
Posts: 910
Joined: Sat Aug 02, 2003 1:22 pm
Location: CME Office, Bodgit & Scarper Engineering.
Contact:

Post by andrewgadd »

David, there are two ways to achieve the 45degrees incline with MSTS.

First, (and I can't quite remember) I think you hold down the "T" key while altering the grad of the track section, this can be done repeatedly with the same track section. This method is a bit hit and miss!!!

Second, (my preferred favourite) is to manually edit the world file after laying a section of track; this is far more predictive, as you can calculate the correct gradient and just enter the number!!!
The only draw back with this method is you can only edit one track section at a time after having laid it in RE, the track data base going “nutsâ€
User avatar
andrewgadd
Well Established Forum Member
Posts: 910
Joined: Sat Aug 02, 2003 1:22 pm
Location: CME Office, Bodgit & Scarper Engineering.
Contact:

Post by andrewgadd »

Using method one..............

Image

The next noticeable problem is of course the terrain; the obvious solution to this is building your own in a 3d program and adding it under the track section in RE. Again editing the world file will ensure perfect alignment.

Andrew.
dkightley
Very Active Forum Member
Posts: 9802
Joined: Sat May 08, 2004 8:52 pm

Post by dkightley »

Straights are easy-peasy. Try tilting points up to greater than the default amount.....you have to turn them round and round and round! :o
User avatar
darren10000
Established Forum Member
Posts: 496
Joined: Thu Feb 02, 2006 11:33 am
Location: Virtual Longhedge Engine Works or on the floor of my Local in Herne Bay Hic...

Post by darren10000 »

Thanks for all the input, sorry I havent got back to anyone as I have been away this weekend.

The steepest Gradient on the C&W was 1:28; and the winding engines worked bi-directionally except on the the 1 in 28 stretch at bogshole bank, where Invicta Took over for the level section, and also the stretch from Tyler Hill summit down through the tunnel into what is now the farmers market on the Canterbury West site.

This is going to be a challenge I know but I've got next week off, so with any luck I'll get started properly. Any suggestions or help please feel free to PM me.
Locked

Return to “[MSTS1] Route Building”