Woodhead to reopen!
Moderator: Moderators
- rtracey
- Been on the forums for a while
- Posts: 127
- Joined: Sat Nov 27, 2004 4:56 pm
- Location: Rotherham
Woodhead to reopen!
Is it right what I saw on the news that the old Woodhead line may be re-opened & used for carrying freight between Sheffield & Manchester?
- staticxfreak
- Well Established Forum Member
- Posts: 659
- Joined: Sat Aug 30, 2003 4:59 pm
- Location: Darwen, Lancashire, England
- Contact:
- vidal
- Been on the forums for a while
- Posts: 134
- Joined: Mon Jul 05, 2004 9:59 am
- Location: Tottington, Lancashire
- Contact:
Sorry to rain on the parade, but the Woodhead line will not realistically reopen in the near future without a major change in both government policy and the will of freight operators to take lorries off the roads. In the years that the line has been closed large parts of the line have been developed, housing, roads cycleways and national park etc. Now I know that theoretically these are not insurmountable, but in the real world they are.
More importantly the Woodhead line is not very convenient, it serves no major communities along it's length. We no longer have the West Yorkshire coal or steel traffic to justify its reopening. To take lorries off the M62, A57 and A628 the alternative would have to be fast and cheap. The journey times by HGV are in the order of 90 - 120 minutes (Sheffield to Manchester) taking into account loading times at the railheads, how much time will be saved? Fuel costs? An HGV doing 10mpg will cost about £50 for the journey, are costs likely to be less? There may be many other reasons, but convenience and cost will always win out in the end.
However the biggest stumbling block to any reopening of the Woodhead Route would be the forced reloacation of the St******c Re****e.
More importantly the Woodhead line is not very convenient, it serves no major communities along it's length. We no longer have the West Yorkshire coal or steel traffic to justify its reopening. To take lorries off the M62, A57 and A628 the alternative would have to be fast and cheap. The journey times by HGV are in the order of 90 - 120 minutes (Sheffield to Manchester) taking into account loading times at the railheads, how much time will be saved? Fuel costs? An HGV doing 10mpg will cost about £50 for the journey, are costs likely to be less? There may be many other reasons, but convenience and cost will always win out in the end.
However the biggest stumbling block to any reopening of the Woodhead Route would be the forced reloacation of the St******c Re****e.
- spartacus
- Very Active Forum Member
- Posts: 3461
- Joined: Sat May 04, 2002 12:00 am
- Location: Dewsbury
- Contact:
Although it could be reopened fairly easily between Penistone and Hadfield, presumably with the national grid diverted via the original tunnels it really wouldn't be worth it, especially for the traffic they're planning on carrying. I can't see there being a big improvement in journeys times once loading and unloading are taken into account.
"I am not a number, I am a free man!"
No to I.D. cards.
No to I.D. cards.
- rtracey
- Been on the forums for a while
- Posts: 127
- Joined: Sat Nov 27, 2004 4:56 pm
- Location: Rotherham
Guess we won`t be seeing any of these then.
<IMG width="545" height="354" SRC="http://www.atomic-album.com/showPic.php/108897/DC03.jpg">
<IMG width="545" height="354" SRC="http://www.atomic-album.com/showPic.php/108897/DC03.jpg">
- allypally
- Very Active Forum Member
- Posts: 6519
- Joined: Thu Aug 22, 2002 2:28 pm
- Location: West Midlands
If the line is electrify, you can guarantee that those trains will not be running on it (if it even does open) - they use a non standard and outdated 1500v DC system as opposed to the 25kV AC system that is the current electrification station, and having it as an isolated stand alone route would make the route once again, fairly dodgy.
Alex
Honorary Citizen of the Independent Peanut Republic of Rushey Platt
Honorary Citizen of the Independent Peanut Republic of Rushey Platt
Reopening between Tinsley and Mottram is just unviable - it's far too short for a freight train run - even a RoLa - 'Rolling Motorway' - scheme which it sounds like is being proposed. I can see the precedent, trying to achieve the Swiss-style RoLa scheme across the Pennines, but the distances for the Swiss trains are considerably longer - Freiburg in Germany to Novara in Italy is not the same as Manchester-Sheffield! The only way it could work would be to apply tolls to all Pennine and Peak District routes, charging the hauliers punitive rates - even then there would be a lot of diversionary traffic routing through Staffordshire, or via the M62 (presumably it would be exempt from the tolls). That said, if part of the Central Railway scheme for a new freight line between the Channel Tunnel and the North West, reopening becomes more viable.
As to the old EM1/EM2s - does T&W need any load-bank testing done?
As to the old EM1/EM2s - does T&W need any load-bank testing done?
- johncas
- Very Active Forum Member
- Posts: 1613
- Joined: Tue Jan 15, 2002 12:00 am
- Location: THURNBY LODGE, LEICESTER UK 15 Mins from GCR Leicester Nortn
- Contact:
Why not re-open it gets all those poluting lorrys off our roads less fumes from those diesel engines and all the people living along the line get some public transport and a quick way to get from sheff to manchester
My spec is 9.0ghz 4GB ram High Spec ATI gaming Graphics Card 32" TV as Monitor
THE UK BUS FORUMS http://leicesterbus.proboards10.com
My Youtube videos http://uk.youtube.com/user/johncas1
My fotopic album http://johncasingena6499.fotoblog.co.uk/
THE UK BUS FORUMS http://leicesterbus.proboards10.com
My Youtube videos http://uk.youtube.com/user/johncas1
My fotopic album http://johncasingena6499.fotoblog.co.uk/
