For all of those keen and budding London - Southampton route fans out there, you will be pleased to know that an official patch is going to be released by myself within the month.
Following the 'DIY update' earlier this year, i ventured into the deep to try and get a proper patch released. Although the route will not have any new scenery (as in buildings and trees) as yet, it will include a number of things:
- firstly full operational facilities of the whole route, with no catches or freezing. this includes Waterloo-Clapham, and the whole of the 'Up' lines from Eastleigh
- full signalling and speed limits of the route, including multiple feathers on route indicators, theatre signals and ground signals.
- revised trackwork at Winchester, Shawford, Eastleigh and Southampton
- a 2 mile (ish) extension down to Freightliner Maritime terminal (not done yet). this includes Millbrook station, Millbrook Freightliner terminal, Southampton Western and Southampton Eastern docks
- a few more roads included with car spawner (but not too many)
- hopefully a new set of paths to go with the route
And i think thats it as far as i can remember. Although there isn't tooo much to see i may post a few screenies if i get the time, so watch this space! As i have said it should be done within the month, and that'll keep you all busy over christmas
Cheers
