B&SR

Moderator: Moderators

Locked
IcarusSys
Getting the hang of things now
Posts: 22
Joined: Sat Dec 06, 2003 10:18 pm
Location: Havant, Uk
Contact:

Post by IcarusSys »

In BVE, the LU signal are on the ground beside the track, I think this would look good and be more realsitic. But I like your idea of invisible signals too. :fadein:
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

u mean a tablet system? (or whatever its called) one tablet 4 each streach of line so only one train is on it at one time. that kind of thing?
IcarusSys
Getting the hang of things now
Posts: 22
Joined: Sat Dec 06, 2003 10:18 pm
Location: Havant, Uk
Contact:

Post by IcarusSys »

EXACTLY!
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

the signals are now gon. they looked good but like you say for a line of this small size they are an unesisary finacial burden. pluss they are not worth the effort. (there are no more signals on ver 2)
User avatar
Frsimplex1993
Building the West Lancashire Route
Posts: 2321
Joined: Tue Aug 19, 2003 9:46 am
Location: Ffestiniog Railway
Contact:

Post by Frsimplex1993 »

Great route, but witch station is the incline at?

Cheer's,
User avatar
jdtech
Well Established Forum Member
Posts: 988
Joined: Sun Feb 23, 2003 9:44 pm
Location: England, Hampshire, Ashurst

Post by jdtech »

robert159 wrote:The signals are now gone. They looked good but like you say for a line of this small size they are an unecessary finacial burden. Plus they are not worth the effort. (there are no more signals on version 2)
The railway had enough money to add and remove them though...:wink:

John
The Talyllyn Railway - The World's First Preserved Railway

Image
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

no not really. the signals just appeared between versions. so in a way they never existed. im just waiting 4 icurus systems to finnish the installer file before uploading version 2.

oh and the incline i mentioned is the one leading out of the quarry (now renamed as the mines) up to the switch back. though im not sure i can call it a swithcback anymore.
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

IF YOU WANT 2 SEE WHAT CHANGES HAVE BEEN MADE I SUGEST YOU DOWNLOAD V2.1.3 IVE GIVEN THE LINE A GENERAL OVERHALL.
IcarusSys
Getting the hang of things now
Posts: 22
Joined: Sat Dec 06, 2003 10:18 pm
Location: Havant, Uk
Contact:

Post by IcarusSys »

Hi everyone, its me back after visiting that strange planet Yoda lives on to find out about some strange stuff, (He really likes MSTS! lol). Icarus Systems is my GCSE Programming company and had a very useful install util for B&SR until a script kiddie decided that he would check my open ports and try to flash my BIOS ( or summit stuid like that!) I now have to rebuild everything! anyway the point is, it will be here for V3 and onwards, I apolgise to Robert who I was building the instaler for!

If you would like an installer built and I like your route I will build one for you for free!
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

icurussyst u tried 2 get in contact with me about an idea 4 the line. pls poast it hear. i check this place reguarly so i should get it quite quickly.
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

i recently did a search for B&SR (my virtual railway) and it chirned up an actual line
http://www.narrowgauge.iform.com.au/bsr-1.html

does this mean i need 2 change the name? oh i do so hope not.
User avatar
jbilton
Very Active Forum Member
Posts: 19267
Joined: Fri Oct 10, 2003 12:08 pm
Location: At home ..waiting to go to Work.
Contact:

Post by jbilton »

Nope your alright they got a "River" in there as well B&SRRR.... :lol:
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

b&SR version 3 has been started.

the current intention is to extend the line from the dock and continue the line at roughly 90degrees to the current direction of the line. so far i have extended the line out of the mountinous regions that surround the dock. i know roughly where, its going to end up, and the shape of the station in the midle but thats about it. does anyone have any ideas of what i should or could do in between the mountanous region and the largest town in the area (not a city). there is lots of length to play with here people so dont be afraid to go mad.
User avatar
Frsimplex1993
Building the West Lancashire Route
Posts: 2321
Joined: Tue Aug 19, 2003 9:46 am
Location: Ffestiniog Railway
Contact:

Post by Frsimplex1993 »

Will it inclued the JLR?

Cheer's,
User avatar
robert159
Established Forum Member
Posts: 451
Joined: Mon Oct 27, 2003 11:47 pm

Post by robert159 »

with ANY luck yes. but i will need 2 seek outside help for the factory at the end of the JLR
Locked

Return to “Narrow Gauge”