More notes on 15in gauge and miniature lines.
Moderator: Moderators
- andrewgadd
- Well Established Forum Member
- Posts: 910
- Joined: Sat Aug 02, 2003 1:22 pm
- Location: CME Office, Bodgit & Scarper Engineering.
- Contact:
More notes on 15in gauge and miniature lines.
This is by way of a reply to those questions asked in “15in gauge at Pendre!!!â€
Andrew, CME.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
- Frsimplex1993
- Building the West Lancashire Route
- Posts: 2321
- Joined: Tue Aug 19, 2003 9:46 am
- Location: Ffestiniog Railway
- Contact:
I'm confused Pittleyfalley said that you have to have a Lager size track
next to it!!!?
Where can i get the 15in track??
I think i'll leave the shape file manager to the expert's it does'nt work for me could sombody do a 15in Peter Pan with a tender since my friend has one!!
Thank's,
I think i'll leave the shape file manager to the expert's it does'nt work for me could sombody do a 15in Peter Pan with a tender since my friend has one!!
Thank's,
Cheers,
William a.k.a Silly Billy
http://www.freewebs.com/shrailway
http://www.freewebs.com/joflrailway
http://www.freewebs.com/railmachinesltd
William a.k.a Silly Billy
http://www.freewebs.com/shrailway
http://www.freewebs.com/joflrailway
http://www.freewebs.com/railmachinesltd
- pitleyfalley
- Builder of the Southwold Railway Route
- Posts: 2366
- Joined: Sat Dec 13, 2003 11:56 pm
- Location: Tinkering with a new project
- jdtech
- Well Established Forum Member
- Posts: 988
- Joined: Sun Feb 23, 2003 9:44 pm
- Location: England, Hampshire, Ashurst
Andrew, don't worry I found it in the .zip on the website! So let me get this clear, if you have a 2x piece of route and a UKN ( 2ft 4 not Xtracks 3ft!) piece of track, how much do I have to scale down a 1x piece of rolling stock to fit on the UKN piece of track?
The Talyllyn Railway - The World's First Preserved Railway

- andrewgadd
- Well Established Forum Member
- Posts: 910
- Joined: Sat Aug 02, 2003 1:22 pm
- Location: CME Office, Bodgit & Scarper Engineering.
- Contact:
To get standard gauge stock to fit Truescale track you need to half it or x0.5 in "SFM"
Andrew, CME.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
- Frsimplex1993
- Building the West Lancashire Route
- Posts: 2321
- Joined: Tue Aug 19, 2003 9:46 am
- Location: Ffestiniog Railway
- Contact:
How does Shape file manager work? Do I requier Microsoft script write??
Do i minemize the track to change to 15in?
Thanks
Bill
Do i minemize the track to change to 15in?
Thanks
Bill
Cheers,
William a.k.a Silly Billy
http://www.freewebs.com/shrailway
http://www.freewebs.com/joflrailway
http://www.freewebs.com/railmachinesltd
William a.k.a Silly Billy
http://www.freewebs.com/shrailway
http://www.freewebs.com/joflrailway
http://www.freewebs.com/railmachinesltd
- jdtech
- Well Established Forum Member
- Posts: 988
- Joined: Sun Feb 23, 2003 9:44 pm
- Location: England, Hampshire, Ashurst
Right, I got rid the 2600, and stuck with the default stock, the Dash-9, this picture shows a 0.5 scaled down Dash, running on the 2x Ffes, so I presume this is 15 inch (roughly) stock.
<IMG width="800" height="600" SRC="http://album.atomic-systems.com/showPic ... ngdash.JPG">
<IMG width="800" height="600" SRC="http://album.atomic-systems.com/showPic ... ngdash.JPG">
The Talyllyn Railway - The World's First Preserved Railway

- andrewgadd
- Well Established Forum Member
- Posts: 910
- Joined: Sat Aug 02, 2003 1:22 pm
- Location: CME Office, Bodgit & Scarper Engineering.
- Contact:
Looks good.
Now just lay some Truescale NG tracks from XTracks3.7.
Be warned the pointblades are still floating in XTracks3.7, I have an upload sat waiting approval that cures the problem.
Now just lay some Truescale NG tracks from XTracks3.7.
Be warned the pointblades are still floating in XTracks3.7, I have an upload sat waiting approval that cures the problem.
Andrew, CME.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
- Frsimplex1993
- Building the West Lancashire Route
- Posts: 2321
- Joined: Tue Aug 19, 2003 9:46 am
- Location: Ffestiniog Railway
- Contact:
I wish to shrink Kevin's Alco how do i do it??
I don't understand the file you click on options and nothig happens why??
I don't understand the file you click on options and nothig happens why??
Cheers,
William a.k.a Silly Billy
http://www.freewebs.com/shrailway
http://www.freewebs.com/joflrailway
http://www.freewebs.com/railmachinesltd
William a.k.a Silly Billy
http://www.freewebs.com/shrailway
http://www.freewebs.com/joflrailway
http://www.freewebs.com/railmachinesltd
- andrewgadd
- Well Established Forum Member
- Posts: 910
- Joined: Sat Aug 02, 2003 1:22 pm
- Location: CME Office, Bodgit & Scarper Engineering.
- Contact:
Assuming that you have found the shape file (Alco.s ?) whilst in "SFM".
Allow the options button to scroll down and press uncompress, this will uncompress the file so "SFM" can work it, next allow the options button on scroll down and this time press the scale button.
A word of warning "SFM" does not always work on rolling stock. The problem occurs when MSTS try’s to add the re-scaled stock to the game and the user is told that xxxxxx can not be added to the world, then you get "SEND, DON'T SEND".
I am trying to figure out what is happening here but with not much success so far.
Allow the options button to scroll down and press uncompress, this will uncompress the file so "SFM" can work it, next allow the options button on scroll down and this time press the scale button.
A word of warning "SFM" does not always work on rolling stock. The problem occurs when MSTS try’s to add the re-scaled stock to the game and the user is told that xxxxxx can not be added to the world, then you get "SEND, DON'T SEND".
I am trying to figure out what is happening here but with not much success so far.
Andrew, CME.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
Bodgit & Scarper Engineering
___________________________________
I’ve suffered for my art, now its your turn.
- saddletank
- Very Active Forum Member
- Posts: 14183
- Joined: Mon Dec 03, 2001 12:00 am
- Location: UK East Midlands
Re: More notes on 15in gauge and miniature lines.
[quote="andrewgadd"]Is this any better for you “Saddletankâ€
Martin
_______________________________________
ED209: "Please put down your weapon. You have 20 seconds to comply."
_______________________________________
ED209: "Please put down your weapon. You have 20 seconds to comply."
- ianmacmillan
- Very Active Forum Member
- Posts: 9588
- Joined: Fri Feb 28, 2003 12:39 pm
- Location: N. Lanarkshire Scotland
From the picture I see that you have found one of SFM little problems.
The wheels have dissapeared.
If you look at wheelRadius you will see that is says (21in/ )
SFM Doesn't like fractions. and has left out the final 2.
Before you reduce anything you need to check for sums in the eng file and work them out to a single number.
One of the main things to check is the position of all the lights.
The wheels have dissapeared.
If you look at wheelRadius you will see that is says (21in/ )
SFM Doesn't like fractions. and has left out the final 2.
Before you reduce anything you need to check for sums in the eng file and work them out to a single number.
One of the main things to check is the position of all the lights.