Hello Mr Anonymous! Some of the route was constructed before the Cardiff extension was released so that pathing was used hence the need for both routes being required. I may have a look at this in the future?tubemad wrote:I'd love to try this and can't wait to get a proposed scenario done, I need the Bristol - Swansea route though to make it happen, though I am confused at the requirements for this route.
Essential requirements, I need South Wales Coastal for Scenery and Stock (though making a scenario I won't need to worry about the latter), and Bristol - Swansea routes. Now if Bristol - Swansea is essentially and extension to Swansea from South Wales Coastal, would it not be the same scenery? Is it essential to have both the Bristol - Cardiff AND Bristol - Swansea routes installed?
Any help appreciated!
Peter