davep wrote:Bingo !

One down, hundreds to go at.....
nigeldarl5 wrote:tried running the 150 from swansea to harafordwest and at time of departure there seems to be a hst set in the way and it aint moving also further up there is another hst stuck there.
There are 2 static HST consists at the start, one at Swansea Platform 2 and the other in the IEP sidings (Maliphant in old money) Because of the juggling of the trackwork in the area there may be odd consists in scenarios that don't sit where they should. Just drop into the editor and move them out of the way as a quick fix.
Tyneside wrote:Any idea what I'm missing?
..\Assets\jjasloot\Levelcrossings\UK_Sign_pole.bin------looks like that's another we missed out of the archive

sorry!! Trav will probably stick it in the main download later, but for now you can get it (and the other assets from jjasloot that are used) at:
https://ln.sync.com/dl/aecef78c0#jewuwg ... 7-u93i3rbn