Moving track and scenery

Are you thinking about building your own route? or are you already in progress? Talk to the experts in here and find out the best way to do things!

Moderator: Moderators

Locked
g4vvz
Getting the hang of things now
Posts: 24
Joined: Mon Nov 05, 2007 1:06 pm

Moving track and scenery

Post by g4vvz »

I am building a route at the moment in Wiltshire, but I have built it in stages which are not yet connected up. I was working on one when I realised that the bits which I did before had suddenly moved about 20 or 30 miles eastwards and bits of the land had returned to their 'original' flat style. I was wandering if anyone could help!

Thanks
User avatar
RobertM
Very Active Forum Member
Posts: 5907
Joined: Thu Aug 12, 2004 5:28 pm
Location: Centre of my own universe, where its scary

Re: Moving track and scenery

Post by RobertM »

You can do it manually, click on an area and encompass the area you want to move and drag it to where it is needed, but its a tricky procedure. And before you do this (and after you have backed your route folder up), you need to delete all the siding, platform and destination markers on any trackwork your about to remove, or the track wont move
Cheers, Robert :)
Fireman at the Lakeside & Haverthwaite Steam Railway.
Second Valve simulation - https://www.facebook.com/secondvalve?ref=hl
Locked

Return to “[TS] Route Building”