So basically, I had a look at the GE overlay on the default route to see how straightforward it would be to re-lay the track for it. In actual fact my initial plan was that I might possibly be able to somehow frig the markers so existing scenarios would work on an updated version.
Then I had a bash at Green Park, and the plan was to take the route to Devonshire Tunnel just to have a look... And then I just got carried away.
So now the plan is to do a rebuild job on the route to be released in stages via the Workshop, as it is only going to use Kuju assets. I've amended the track rule so I can actually lay the track(!), but I'm not sure whether or not the superelevation will survive. Hopefully it will. Otherwise it's 100% RailSimulator 2007.
But I still need to get back to work on Netherfield so the first upload of this route won't be far off. Hence the thread.
The first bit is Bath-Radstock.
Track is all done and the rest is like yeah, whatever.
(Don't get carried away with the signals either as there are probably fewer than ten in the whole route
Green Park

Click the image to zoom in
Green Park Shed

Click the image to zoom in
Bath Junction

Click the image to zoom in
Co-Op Siding: This is about the point where the Bath scenery ends. Not far to go before the tunnel, but having to mess around with ground levels makes things a little slow.

Click the image to zoom in
Midford

Click the image to zoom in
Writhlington sidings

Click the image to zoom in
Radstock

Click the image to zoom in
Er. That's it, really. Sorry if it's a bit dull...
Cheers
Bob