Change Albula V2b in 1435mm gauge(?)

Are you stuck making RailWorks work? Don't be afraid to ask your questions here, we were all beginners once!

Moderator: Moderators

Locked
RRD890890
Getting the hang of things now
Posts: 13
Joined: Thu Apr 12, 2012 3:39 pm

Change Albula V2b in 1435mm gauge(?)

Post by RRD890890 »

Does anyone know, is there any method to change
the 1000mm gauge track of MickeAr's Albula line V2b
to 1435mm track gauge?
StefanSchmidt
Established Forum Member
Posts: 374
Joined: Thu Sep 04, 2008 2:53 pm
Location: Frankonia - Bavaria - Germany

Re: Change Albula V2b in 1435mm gauge(?)

Post by StefanSchmidt »

Yes, there is away:
Tutorial replacing track at the homepage of RW-Tools: http://www.rstools.info/index.html
Good luck.
Stefan
RRD890890
Getting the hang of things now
Posts: 13
Joined: Thu Apr 12, 2012 3:39 pm

Re: Change Albula V2b in 1435mm gauge(?)

Post by RRD890890 »

StefanSchmidt wrote:Yes, there is away:
Tutorial replacing track at the homepage of RW-Tools: http://www.rstools.info/index.html
Good luck.
Stefan
Dear Stefan:
I have follow the instruction of the tutorial,
after I use the "railnetwork\track\hsc_track_main.xml" to replace the" railnetwork\tracks\matrackmain.xml",
all the original "matrackmai" were disappear.

Image

what's happen for this?
Could you help me again?

thanks a lot!!!!
User avatar
Toldrabald
Established Forum Member
Posts: 420
Joined: Mon May 24, 2010 10:59 am
Location: Germany
Contact:

Re: Change Albula V2b in 1435mm gauge(?)

Post by Toldrabald »

Have you ticked the HSC folder? You need to enable the other route so that the tracks are loaded.

In the editor click on the blue square in the 2nd flyout and on the right side you have to select RSC from the drop down menu and set the mark at Horseshoecurve (or just HSC, not sure).
Please note: english is not my native language, sometimes I may not use the right words to describe what I want to say.
I don't mean to offend anyone, but irony and sarcasm may get lost in translation
RRD890890
Getting the hang of things now
Posts: 13
Joined: Thu Apr 12, 2012 3:39 pm

Re: Change Albula V2b in 1435mm gauge(?)

Post by RRD890890 »

Toldrabald wrote:Have you ticked the HSC folder? You need to enable the other route so that the tracks are loaded.

In the editor click on the blue square in the 2nd flyout and on the right side you have to select RSC from the drop down menu and set the mark at Horseshoecurve (or just HSC, not sure).
Thanks for your help.

yes, i have tick the HSC folder, but there is still no track are loaded....
and, when i "select" the "invisible" track, the properties window on right are show "multiple trackrules" ....
what's happen....?
StefanSchmidt
Established Forum Member
Posts: 374
Joined: Thu Sep 04, 2008 2:53 pm
Location: Frankonia - Bavaria - Germany

Re: Change Albula V2b in 1435mm gauge(?)

Post by StefanSchmidt »

The changing of tracks are a little bit tricky. Tracks are needing a trackrule, this trackule has to be named in the tracks.bin.
Mikes' sample is changing tracks of one Trackrule. So he can use the same one.
Search for trackrule(s) in the Tracks.bin. And change this Trackrule(s) (+Provider and Product <-- to be tickt in the object filter) to an trackrule which contains all of your new used tracks.
May be there is a trackrule delivered with the tracks, or you have to create an own.
After changing you have to clear the cache before starting the Route.
Good Luck
Stefan
RRD890890
Getting the hang of things now
Posts: 13
Joined: Thu Apr 12, 2012 3:39 pm

Re: Change Albula V2b in 1435mm gauge(?)

Post by RRD890890 »

Thanks for you all~! The problem have been solve~!
Locked

Return to “[RW] Help for Beginners”