Question about Semephore Signalling

Are you thinking about building your own route? or are you already in progress? Talk to the experts in here and find out the best way to do things!

Moderator: Moderators

Locked
User avatar
xguerra
Very Active Forum Member
Posts: 2894
Joined: Mon Jun 29, 2009 5:23 am
Location: Hertfordshire

Question about Semephore Signalling

Post by xguerra »

I'm trying to do the Semaphore signalling at North Weald and signalling has never been one of my strong points.

How would you signal, on a single track branch line, a single diversion that splits into two sidings, followed by another single diversion into an adjacent platform.

.........if that makes any sense?

Thanks.
Backdated Trainsim
My site with my content: http://backdatedtrainsim.weebly.com/
roadhog123
Getting the hang of things now
Posts: 14
Joined: Mon Aug 27, 2012 9:52 am
Location: Kent, UK

Re: Question about Semephore Signalling

Post by roadhog123 »

At a diverging point, either a junction signal will be used, or if the line is simply for shunting, a shunt signal will control that direction.
Have a read here: http://www.signalbox.org/signals/semaphore6.htm. Should tell you what you need to know. :)
Image
Current Project: Kent High Speed Extended. My Flickr
Locked