I have almost finished the new route and have created a trial scenario to test the Loader, Lights for the Quarry and some signals.
I removed the extra signals I had added in my first version, between Frome and the Junction to the Quarry, as they did not always work out in some scenarios.
So basically assets from Stevens Pass and Hatchet Hill Quarry have been removed in this new version and the very available Loader has been used.
Due to a loss of some great Quarry Vehicles from the previous Stevens Pass and HHQ, I found some suitable replacements through CreativeRails "East Midlands Coal route.
They will not be essential to running the route but do add some nice eye candy {as it were}
Here is the link to a 4 minute video clip of my trial loading at Whatley Quarry, there is still work to go on centering the loader.
https://youtu.be/_8-XY702ZJc
I hope to have the new version loaded into the Workshop in the not too distant future.
The new version with the more available asset will be renamed Whatley Quarry Re-Mastered.
The original version will remain in the Workshop.
Roland.