Dam passengers taking their time to board!
Posted: Wed Jan 10, 2007 2:12 pm
I have some rolling stock which takes 30 seconds to load say 20 passengers and others which take 4 1/2 minutes for some amount at the same platform, is there a way to change the time it takes to load passengers on the ENG beside obviously changin the passengers at the platform?
GM228
GM228