Penzance to Paddington

The MSTS 1 Route Editor can be a beast to use, but it's capable of some amazing results, here you can talk with the wizards that are building some of the fantastic routes available and learn how to make your own.

Moderator: Moderators

dcduncan
Established Forum Member
Posts: 398
Joined: Sun Oct 06, 2002 2:34 pm
Location: South Wales

Re: Penzance to Paddington

Post by dcduncan »

dwjoy wrote:Martin,
Shown are some screen shots of the branch line to Princetown.

/Snip

Click the image to zoom in


Click the image to zoom in

/snip

Regards

Derick
Looks lovely though of course the train is too long. My Dad spent a lot of his youth watching the 44xx with one coach and a couple of vans or if there were prisoners to transport 2 whole coaches as the regular trains across Dartmoor to Princetown. I think Ingra tor was his favourite bit of the line.

David
User avatar
saddletank
Very Active Forum Member
Posts: 14183
Joined: Mon Dec 03, 2001 12:00 am
Location: UK East Midlands

Post by saddletank »

Caught the Dartmoor bleakness very well there guys. Have you created any custom stations - that default platform is a bit long isn't it.
Martin
_______________________________________
ED209: "Please put down your weapon. You have 20 seconds to comply."
dwjoy
Established Forum Member
Posts: 392
Joined: Sat Dec 08, 2001 12:00 am

Penzance to Paddington

Post by dwjoy »

saddletank wrote:Caught the Dartmoor bleakness very well there guys. Have you created any custom stations - that default platform is a bit long isn't it.
Yes - Dave has recently created a series of stations which will replace many of those currently in place.

Derick
iceman2
Getting the hang of things now
Posts: 25
Joined: Fri Mar 07, 2003 2:18 pm
Location: Here, There and Everywhere!!

FANTASTIC

Post by iceman2 »

I cant wait untill this route is available, I live in Exeter myself and have always complained about too many South-Mid-North England routes being produced.

Now finally someone has built, (or in the middle of) a South West route.

Lets hope you got the gradients right at DAYTON.

:lol:
User avatar
alisterbetts
Very Active Forum Member
Posts: 1554
Joined: Mon Jan 14, 2002 12:00 am
Location: City of Bristol, UK
Contact:

Post by alisterbetts »

Would that be the same as DAINTON? 8)
Lost your love of life? Too much apple pie!

Have a look at my pics at http://alisterbetts.fotopic.net/
User avatar
Al40k
Getting the hang of things now
Posts: 90
Joined: Sat Nov 02, 2002 8:22 pm
Location: Reading

How long?

Post by Al40k »

Any idea how long it will be before the route is finished and uploaded or burned to CD as the case may be?
dwjoy
Established Forum Member
Posts: 392
Joined: Sat Dec 08, 2001 12:00 am

Penzance to Paddington

Post by dwjoy »

Phase I (Penzance to Exeter) is complete and Matt has the CD. When its our turn, he will distribute copies of it.

Derick
User avatar
phat2003uk
SWTVR Assistant Manager
Posts: 7452
Joined: Thu Aug 08, 2002 5:52 pm

Post by phat2003uk »

Will the route include Slough to Windsor ?
User avatar
XPTE
Very Active Forum Member
Posts: 3434
Joined: Mon Apr 08, 2002 12:00 am
Location: Bristol

Post by XPTE »

I know it's difficult to estimate, but can you foresee a sort of roughly approx date of when the WHOLE route will be fully completed? i.e. late 2003, Spring 2004, etc.

Keep up the good work anyway, and don't rush it.
dwjoy
Established Forum Member
Posts: 392
Joined: Sat Dec 08, 2001 12:00 am

Penzance to Paddington

Post by dwjoy »

Dave and I have been discussing the future of the Penzance to Paddington route. Phase I (Penzance to Exeter) is complete and track has been laid to Paddington via Bristol and via Westbury. But.... there is a problem. The problem seems to be that the route is so large and has been rebuilt so many times that it is now unstable. For instance, after doing a track rebuild, the resultant route may crash the AE. The remedy is to go back to the last backup and re-do everything. Every effort has been made to stabilize the route including deleting all the tiles east of Exeter ( that made things worse). Another consequence of the size of the route is that AE will freeze if you move the map too fast or zoom in or out too fast. Way around that is to tap the arrow keys to move the map, letting AE complete the map re-draw before hitting it with another.
It was our intent to add scenery, etc to the rest of the route but it seems now that we wont be able to, given that track rebuilding cannot be done. Our hope is that MSTS2 may contain diagnostics or other tools that will enable us to move forward with the route.
Functionally, the route runs just fine, fps usually above 40, signals are working, etc and the scope for activities is just enormous. Completion of the route however, as originally envisaged, is in doubt.
User avatar
phat2003uk
SWTVR Assistant Manager
Posts: 7452
Joined: Thu Aug 08, 2002 5:52 pm

Post by phat2003uk »

so ?
dwjoy
Established Forum Member
Posts: 392
Joined: Sat Dec 08, 2001 12:00 am

Penzance to Paddington

Post by dwjoy »

Phat... could you re-phrase your comment?
dgriffin
Getting the hang of things now
Posts: 28
Joined: Mon Feb 24, 2003 8:34 am

Post by dgriffin »

That sounds like bad news. This route is the one I have been most looking forwards to. perhaps It would be best to "publish" it in more than one part? If the Exeter-westwards is working OK concentrate on getting that one finished and later on work on Exeter to (say) Bristol Parkway. Activities could then be divided up into two or more parts. So a Paddington to Penzance could be done in (say) three parts. By the way, is anyone doing Bristol to Paddington? (not that I'm volunteering!!)

Good luck

David
User avatar
Baily9531
Very Active Forum Member
Posts: 2474
Joined: Sun Nov 17, 2002 4:09 pm
Location: Wales/Chester/Bury
Contact:

Post by Baily9531 »

so does this mean exeter-penzance is being released soon or not? or just not bothering? :cry: :cry: :cry:
Restoring D8233 & D5705
http://www.d8233.org.uk
Image
dwjoy
Established Forum Member
Posts: 392
Joined: Sat Dec 08, 2001 12:00 am

Penzance to Paddington

Post by dwjoy »

The Penzance to Exeter piece is complete and a CD was sent to Matt for distribution. However a frantic email from my partner telling me I had left out the consists/trainsets required is causing another CD to be made and shipped to Matt which should happen in a few days.
In no sense are we abandoning this route. We have put too much into it for that - over eighteen months's worth of work
Locked