Hi!
Yes, work is ongoing on the route... ongoing.. ongoing..
I had some trouble with the route due to not beeing able to do a rebuild. But that problem is now solved and the route is stable. I hope that will be the case for the rest of the life for this route...
The route has been slightly expanded during the work, mainly the two branchlines for the iron ore cargo that has been extended to be 60km each, so the total length of the route is now about 350 km. However, I just love to make a release soon, so I have decided to make a first release with a reduced route, and I hope that will happend soon. If I shouldent have this trouble, the gool was to have a first release at the 8th of March on a MSTS show at the Swedish railway musem that we arrange. But that did not work out unfourtanly, but I am very happy to be on tracks again.
Here is some screenshoots from the newest parts:
These pictures is from one of the new branchline. It is the first station on that line, with long sidetracks to cover the long iron ore trains. Sometimés the Iore loco is visible here, but the most freqvent iorn train loco is the old Dm3 loco.
Due to the trouble with the track database, Antberg station is now completely rerouted. Also the three industrial areas in Antberg is completed, one of these industrial areas is a oil refinery.

A new train shed is placed in Antberg for light train maintenance.
Antberg has been fully reconstructed as a town as well, so a lots of new buildings are addad to the town. The hole Antberg area is completed now.