Hi
Considering making an activity for TS, I was wondering what Central Trains would do if the Peterbourough to Ely line was shut because of engineering works or an incident. Would they terminate the trains at Peterborough and then transfer the passengers in coaches, divert the trains by Hitchin and Cambridge, or stop the train in Hitchin or Stevenage an transfer the passengers in another train, either a First Capital Connect or a special Central train?
Thank you for your help
Paul
What would they do?
Moderator: Moderators
- carlwestwood
- Very Active Forum Member
- Posts: 4078
- Joined: Thu Feb 16, 2006 11:33 pm
- Location: Melton Mowbray - I hate the Pork Pies
- Contact:
- salopiangrowler
- Very Active Forum Member
- Posts: 7796
- Joined: Mon Aug 12, 2002 8:56 pm
- Location: Shrewsbury
- Contact: