footbridge needed please

Topics from Old Deleted Forums, READ ONLY, kept for reference purposes.

Moderator: Moderators

Locked
Jagger14uk
Been on the forums for a while
Posts: 107
Joined: Thu Feb 14, 2002 12:00 am

footbridge needed please

Post by Jagger14uk »

hi all.the work for this route seems to be never ending.anyone who is up for a challange. I have been busy this morning taking pictures of buildings alone the route that i am creating(keighley and worth valley railway) the station at haworth is in need of a nice foot bridge but the ones on this site don't go right as this only has one ramp.I have pictures that i can send in a zipfile if anyone would be so kinda to have a go forme..



ANy questions i will try and answer just post your e-mail on here and i will send them to u thanks everyone
User avatar
JohnEyres
Creating the WCML at Warrington
Posts: 511
Joined: Sun Dec 30, 2001 12:00 am
Location: Warrington
Contact:

Post by JohnEyres »

Jagger, before you take the time to ask so many questions, check out other routes objects even if they are foreign ones. There are a few footbridges already in MSTS. I think two are quite British looking from the S&C and look good anywhere. There is a green japanese one too which could be used.
Warrington Railways Route Author

Route Progress: http://johneyres.tripod.com/railway/msts/newms.htm
Jagger14uk
Been on the forums for a while
Posts: 107
Joined: Thu Feb 14, 2002 12:00 am

thanks

Post by Jagger14uk »

i have looked on most of the routes and im pretty certain that they havn't got one like this its unique. Thanks for the tip though.sorry about askin some many questions im just keen to learn and show everyone my finished route.
regards Jagger
User avatar
Hymek
Very Active Forum Member
Posts: 2270
Joined: Thu Jan 24, 2002 12:00 am
Location: 38A/85D
Contact:

Post by Hymek »

While someones at it, Im doing a fictional line and i need a footbridge that will cross 4 lines, I cannot use 2 joined together
http://www.svr-dmu.org.uk - DMU Group WM
http://www.englishelectricpreservation.co.uk/ - English Electric Preservation

Producer of Rolling Stock for the UKTS community Since September 2002
User avatar
JohnEyres
Creating the WCML at Warrington
Posts: 511
Joined: Sun Dec 30, 2001 12:00 am
Location: Warrington
Contact:

Post by JohnEyres »

There is only one default 4 track footbridge which is for a japanese route and is green! Its called greenbridge or something. Looks a bit odd, but you could still use it.
Look in the downloads section because I think there is a GWR footbridge which spans four tracks.
Warrington Railways Route Author

Route Progress: http://johneyres.tripod.com/railway/msts/newms.htm
Timcourt1
MidEast UK Author
Posts: 2552
Joined: Mon Dec 03, 2001 12:00 am
Location: Michigan USA
Contact:

Post by Timcourt1 »

there are 2 x 4 track footbridges in ecml3.1 too and 2 x 2 track footbridges