Search found 2168 matches

by pitleyfalley
Fri Jun 14, 2002 3:08 pm
Forum: Narrow Gauge
Topic: Coaches
Replies: 1
Views: 851

Coaches

Well done again Kev. yet more toys to play with :D

Chris
by pitleyfalley
Fri Jun 14, 2002 12:23 pm
Forum: Narrow Gauge
Topic: Kevin - my roster is one loco short!
Replies: 21
Views: 3771

Kevin, Not quite the same, but I have mailed you a pick of the Baldwin, on the new second gallery ive built today. It shows what is wrong with the roof, ive also noticed the front pony truck wheels have 1/2 of them missing!!! :cry: Ive not had troubles at Nant, if its the front coupling thingy again...
by pitleyfalley
Fri Jun 14, 2002 9:27 am
Forum: Narrow Gauge
Topic: Large scale v True scale
Replies: 6
Views: 1235

This could also be done at Wharf on the TR, Minfordd on the Ffestiniog, Dinas if the NWNGR/WHR/SSR etc etc gets done, Abersywth on the Rheidol line, Gil Fach Ddu on the Llanberis lake/Dinorwic 4 foot 2 foot intercahnge etc etc,

Would be very useful really.

Chris
by pitleyfalley
Fri Jun 14, 2002 9:23 am
Forum: Narrow Gauge
Topic: Kevin - my roster is one loco short!
Replies: 21
Views: 3771

The ash pit is outside the loco running shed (thats the one i fell down :roll: ) Then in the shed there are 2 inspection pits, There is one in the workshop, and another in the west shed, we have one down at Wharf which is normally filled with water as th drainage is screwed. :-?


Pitley Falley
by pitleyfalley
Fri Jun 14, 2002 9:23 am
Forum: Narrow Gauge
Topic: Kevin - my roster is one loco short!
Replies: 21
Views: 3771

Ah pit is outside the loco running shed (thats the one i fell down :roll: ) Then in the shed there are 2 inspection pits, There is one in the workshop, and another in the west shed, we have one down at Wharf which is normally filled with water as th drainage is screwed. :-?
by pitleyfalley
Fri Jun 14, 2002 9:18 am
Forum: Narrow Gauge
Topic: Kevin - my roster is one loco short!
Replies: 21
Views: 3771

Hello Steve,

In the new version of the Talyllyn, would it be possible to put the smoke hood louvres on the shed roof? Just thinking if the loco was in the shed it would look like it was being steamed up.

Just off to take another trip along the Afon Fathew! :D

Chris


[/img]
by pitleyfalley
Thu Jun 13, 2002 10:25 pm
Forum: [MSTS1] Route Building
Topic: Tallylyn Route
Replies: 53
Views: 8722

I have full singnalling plans for the TR, aber is on colour lights, Wharf is on a colour light inthe cutting a route disc indicator by the bridge for either the platform or yard roads. However, the blockposts all ave sighitng boards would it be possible to do coloured sigthing boards, ir: signals th...
by pitleyfalley
Thu Jun 13, 2002 10:16 pm
Forum: Narrow Gauge
Topic: Kevin - my roster is one loco short!
Replies: 21
Views: 3771

Martin, My views on the Ffes are somewhat bias i know, but to say the least they are somewhat dim. The train out fo Porthmadog was reminisent of a Japanese commuter train last time I travelled on it. :-? The fact that the loco boilers last 1/2 the length of theTalyllyn ones (so I have beeen told by ...
by pitleyfalley
Thu Jun 13, 2002 9:20 pm
Forum: Narrow Gauge
Topic: Kevin - my roster is one loco short!
Replies: 21
Views: 3771

Hello all, Yes weve had to do 9 min turn arounds before when No.1 failed, normally the 4th engine is laying over for an hour at Wharf, it also helps to attract passengers. The south shed, (the little white one by the brick sheds) is now used as a store for one of the steam engines, and spare parts, ...
by pitleyfalley
Thu Jun 13, 2002 4:12 pm
Forum: Narrow Gauge
Topic: Ffestiniog Rly single fairlie "Taliesin"
Replies: 10
Views: 1757

Kevin, Wow, one of our Talyllyn Drivers is obssesed with Taliesin, and I see a large practical joke coming one with him email address and a screenshot. :wink: Will we also get Moel Tryfan, Snowdon Ranger etc etc? Also is this the 'new' Taliesin with the scaled down/up? Loco and original Dome etc etc...
by pitleyfalley
Wed Jun 12, 2002 10:01 pm
Forum: [MSTS1] General MSTS Discussion
Topic: What do you think of your local railway service
Replies: 33
Views: 2103

Im with Central Trains :( \Which is a shame, only today the train was busy the seats were loose, the stock was diabolically filthy, and there was even paint peeling off the outside of the coach. :x The station staff aswell, were preoccupied with 1 customer, making me very nearly miss the train. It l...
by pitleyfalley
Wed Jun 12, 2002 9:54 pm
Forum: Site Admin Queries
Topic: No Indication of new posts
Replies: 6
Views: 1566

It managed it before, witht he old forums, you didnt need to log in to know there were new posts. :D But OK - also couldnt log on for a while and it refused to accept my passwaord :-? , (logged on aswell) seems OK now though.

Chris
by pitleyfalley
Wed Jun 12, 2002 9:51 pm
Forum: [MSTS1] Route Building
Topic: NARROW GAUGE
Replies: 7
Views: 1143

Hello,

The Narrow gauge forum has a couple of threads on the track, for my quarry route, i just overwrote the current acleantrack with the narrow gauge one. It means there is no dynamic track ( i think) but then i dont know hoe to use it any way!!!

Chris
by pitleyfalley
Wed Jun 12, 2002 9:10 pm
Forum: Narrow Gauge
Topic: textures
Replies: 2
Views: 1125

Steve,

Thanx :D I shall go forth and build, so the buildings have quarry slate on etc etc. Having seen some examples of what can be done in TSm im inspired to new and greater heights, :) Thanks again Kevin for those diagrams.

Chris
by pitleyfalley
Wed Jun 12, 2002 6:23 pm
Forum: Narrow Gauge
Topic: Large scale v True scale
Replies: 6
Views: 1235

the buildings can be scaled up using shape file manager, downloadable from the Highworth Branch web site, all the buildings have to be doubled in size to fit in wih the Narrow Gauge engines.

Chris

Go to advanced search