Since the release of the Thames-Mersey route I have been inundated with posts, private messages and emails, most of which are very positive, however, there are a number of reported problems.
Currently there are many separate threads, running in many different forums covering these problems, in order to make my job of addressing and fixing these problems easier, I have posted a reply on any thread that refers to a problem, referring you to this new thread, on which I would like all future problems to be posted.
I intend to correct these problems, where possible, and upload a patch file in the not too distant future. In the meantime, here is a list of the reported problems to date.
Known Problems
1. Incorrectly placed signal just north of Rugby station – solution I have slightly moved the offending signal gantry and signals further away from a switch. Will be in patch file.
2. Speed limits incorrect when driving south of Rugby – solution I have introduced new speed limits which take the speed back up to 80 mph for the Northampton loop and 100 mph for the direct line to Roade. Will be in patch file. Just received notice of speed limit problems north of Crewe and south of Stafford, will also rectify and include in patch.
3. The presence of Water Troughs in the “Modernâ€



